LOD 400–500 BIM and as-built coordination on the Qiddiya Speed Track lighting infrastructure, with COBie-integrated handover and zero-clash delivery.
Infrastructure lighting at LOD 400–500 demands both geometric precision and structured asset information for FM-ready handover.
Lead BIM coordination on the Speed Track lighting infrastructure across LOD 400–500, integrating COBie-structured asset information for handover into the operations and FM phase.
High-LOD coordination ran in parallel with COBie data structuring, treating the model not just as a geometric representation but as the source of truth for asset commissioning data. Field validation cycles confirmed model-to-as-built fidelity.
Zero-clash delivery achieved, with COBie-integrated information transitioned cleanly into the operational phase. The model carried forward as a usable asset register, not a static design artefact.