BIM governance, coordination workflows, and Rhino-to-Revit translation for a complex-geometry mixed-use sales and residential centre — part of design-stage coordination across the West Majlis, Talus, and Peninsula components at LOD 100–350.
Complex computational geometry that originated in Rhino had to be brought into a Revit-based coordination environment without losing fidelity.
Implement BIM governance and coordination workflows on a complex-geometry mixed-use centre, including the practical engineering challenge of translating design-stage Rhino geometry into a Revit-based coordination environment without loss of fidelity.
Governance frameworks were established up front. The Rhino-to-Revit translation was managed through structured workflows — Rhino.Inside, Grasshopper-to-Revit pipelines, and selective rationalisation — with geometric fidelity validated at each step against the design intent.
Design intent preserved through translation, governance workflows operating cleanly across consultant teams, and coordination running on a Revit-native federation despite the upstream Rhino-driven design.